On Approval of the Concept for the Development of Housing and коммунal Infrastructure for 2023–2029
Resolution of the Government of the Republic of Kazakhstan dated September 23, 2022 No. 736.
Footnote. The title is as amended by Resolution of the Government of the Republic of Kazakhstan dated March 28, 2023 No. 265.
In accordance with paragraph 66 of the System of State Planning in the Republic of Kazakhstan, approved by Resolution of the Government of the Republic of Kazakhstan dated November 29, 2017 No. 790, the Government of the Republic of Kazakhstan RESOLVES:
1. To approve the attached Concept for the Development of Housing and коммунal Infrastructure for 2023–2029 (hereinafter referred to as the Concept).
Footnote. Paragraph 1 is as amended by Resolution of the Government of the Republic of Kazakhstan dated March 28, 2023 No. 265.
2. Central and local executive bodies and other organizations (subject to agreement) responsible for the implementation of the Concept shall:
1) take measures to implement the Concept;
2) submit information on the progress of implementation of the Concept in accordance with the procedure and within the time limits established by Resolution of the Government of the Republic of Kazakhstan dated November 29, 2017 No. 790 “On Approval of the System of State Planning in the Republic of Kazakhstan”.
3. To declare certain decisions of the Government of the Republic of Kazakhstan invalid in accordance with the Appendix to this Resolution.
4. Control over the implementation of this Resolution shall be entrusted to the Ministry of Industry and Infrastructure Development of the Republic of Kazakhstan.
5. This Resolution shall enter into force from the date of its signing.
Prime Minister of the Republic of Kazakhstan
A. Smailov
Approved byResolution of the Governmentof the Republic of Kazakhstandated September 23, 2022 No. 736
CONCEPT
for the Development of Housing and коммунal Infrastructure for 2023–2029
Footnote. The Concept is as amended by Resolution of the Government of the Republic of Kazakhstan dated March 28, 2023 No. 265.
1. Passport (Main Parameters)
Download
| Name | Description |
|---|---|
| Name | Concept for the Development of Housing and коммунal Infrastructure for 2023–2029 |
| Grounds for the development of the Concept | Decree of the President of the Republic of Kazakhstan dated February 26, 2021 No. 521 “On Amendments to Decree of the President of the Republic of Kazakhstan dated February 15, 2018 No. 636 ‘On Approval of the Strategic Development Plan of the Republic of Kazakhstan until 2025 and Declaring Certain Decrees of the President of the Republic of Kazakhstan Invalid’”; Decree of the President of the Republic of Kazakhstan dated February 21, 2022 No. 812 “On Approval of the Territorial Development Plan of the Republic of Kazakhstan until 2025”; Decree of the President of the Republic of Kazakhstan dated September 13, 2022 No. 1008 “A Fair State. One Nation. Prosperous Society”; Decree of the President of the Republic of Kazakhstan dated November 26, 2022 No. 2 “On Measures to Implement the Election Programme of the President of the Republic of Kazakhstan ‘Fair Kazakhstan – for Everyone and for Each Individual. Now and Forever’”; Resolution of the Government of the Republic of Kazakhstan dated November 29, 2017 No. 790 “On Approval of the System of State Planning in the Republic of Kazakhstan”; the election programme of the Amanat Party “The Path of Change: A Decent Life for Everyone!”. |
| State body responsible for the development of the Concept | Ministry of Industry and Infrastructure Development of the Republic of Kazakhstan |
| State bodies and organizations responsible for the implementation of the Concept | Ministry of Industry and Infrastructure Development of the Republic of Kazakhstan; Ministry of National Economy of the Republic of Kazakhstan; Ministry of Finance of the Republic of Kazakhstan; Ministry of Ecology and Natural Resources of the Republic of Kazakhstan; Ministry of Information and Social Development of the Republic of Kazakhstan; Ministry of Agriculture of the Republic of Kazakhstan; Ministry of Labour and Social Protection of the Population of the Republic of Kazakhstan; Ministry of Energy of the Republic of Kazakhstan; Ministry of Science and Higher Education of the Republic of Kazakhstan; akimats of the regions and the cities of Astana, Almaty and Shymkent; National Chamber of Entrepreneurs (subject to agreement); JSC “Baiterek National Managing Holding” (subject to agreement); JSC “Kazakhstan Housing Company” (subject to agreement); JSC “Otbasy Bank” (subject to agreement); JSC “Kazakhstan Centre for Housing and Communal Services” (subject to agreement); JSC “Kazakh Research and Design Institute of Construction and Architecture” (subject to agreement); RSE “State Urban Planning Cadastre” (subject to agreement); RSE “State Expertise” (subject to agreement). |
| Implementation period | 2023–2029 |
2. Analysis of the Current Situation
Housing and коммунal services are among the fundamental necessities of life determining the standard of living of the population, since the provision of such services and the need for them are particularly acutely felt by the population.
The housing and коммунal services sector consists of two main interconnected elements:
1) the коммунal sector, which includes systems providing water, gas, heat and electricity supply, wastewater disposal, landscaping and maintenance of public facilities and the territories of settlements;
2) the housing sector, which includes multi-apartment residential buildings (hereinafter referred to as MARBs) and individual residential buildings, which are the main consumers of коммунal services.
The provision of коммунal services to the population is regulated by requirements stipulated in national and state standards, sanitary and epidemiological requirements, technical regulations and regulatory legal acts in the relevant areas.
To ensure high-quality territorial planning for the development of коммунal and housing infrastructure, the Unified State Urban Planning Cadastre Information System (hereinafter referred to as the IS USUPC) is being developed. It contains digital data on urban planning projects, buildings, structures, social facilities, and engineering and transport infrastructure.
According to the “Quality of Life of the Population” survey conducted in March 2022, 42.9% of respondents were satisfied with the quality of drinking water in their place of residence, 42.7% with air cleanliness, 48.7% with the cleanliness of the territory adjacent to their homes, 54.9% with the quality of housing, and 66.6% with external noise in their homes. A total of 39.9% of respondents were partially satisfied with their ability to purchase housing independently, and 35.1% with the measures of state support.
According to the results of a sample survey conducted in 2022, housing was owned by one household member in 86.9% of households. The share of households in which housing belonged to two or more household members amounted to 8.3%.
The share of households paying rent for housing to private individuals amounted to 2.3%. At the same time, 51.9% of the respondents stated that they did not experience financial difficulties in paying rent or mortgage payments.
The most common types of housing occupied by households in the Republic are apartment buildings with three or more apartments (46%) and single-apartment (individual) houses (40.6%). Only 11.3% of households live in two-apartment buildings, while 0.7% occupy a room in a house.
Overall, 50% of respondents are satisfied with their living conditions.
At the beginning of 2023, the share of the total housing floor area equipped with water supply reached 98%, sewerage systems – 74%, central heating – 44%, central hot water supply – 38%, and gas supply – 86%.
2.1. Assessment of the Current State of коммунal Infrastructure
1. Water Supply and Wastewater Disposal (Sewerage)
The total length of water supply networks across the Republic increased by 12.3 thousand km between 2019 and 2022 (2019 – 85.3 thousand km; 2022 – 97.6 thousand km), while the length of sewerage networks (wastewater disposal) increased by 1.3 thousand km (2019 – 15.4 thousand km; 2022 – 16.7 thousand km).
The share of water supply networks requiring replacement decreased from 52% in 2019 to 43% at the end of 2022, while the share of sewerage networks (wastewater disposal) requiring replacement decreased from 58% in 2019 to 55% at the end of 2022.
In some regions, the level of deterioration of water supply networks is significantly higher than the national average (within the range of 51–58%). The highest levels of deterioration of water supply networks requiring replacement are recorded in the city of Almaty and the Almaty, East Kazakhstan, Akmola, Ulytau, Abai and Karaganda Regions.
The highest levels of deterioration of sewerage networks are recorded in the Karaganda (68%), Almaty (67%), East Kazakhstan (72%), Pavlodar (74%) and Ulytau (75%) Regions.
Between 2019 and 2022, investment in fixed assets of water supply and wastewater disposal systems increased from KZT 303.7 billion to KZT 484.2 billion, i.e. by 1.6 times. During these years, 17.9 thousand km of water supply and wastewater disposal networks were constructed and reconstructed.
Access of urban residents to water supply services increased by 1.2% between 2019 and 2022, reaching 98.4% (2019 – 97.2%; 2020 – 97.5%; 2021 – 98.1%).
The level of access of rural residents to water supply services increased by 8.1%, reaching 94.5% (2019 – 86.4%; 2020 – 90.1%; 2021 – 93%).
Residents of 4,159 rural settlements are provided with centralized water supply, and integrated block modules (hereinafter referred to as IBMs) have been installed in 741 villages.
Seventy-six group water pipelines with a total length of 15.6 thousand km provide high-quality drinking water to 655 rural settlements with a total population of 1.4 million people.
According to statistical data, the volume of water consumed by the population at the end of 2021 increased by 6.2% compared with 2020 and amounted to 609.2 thousand cubic metres (2020 – 573.7 million cubic metres). The average daily water supply per resident amounted to 87.8 litres. The share of treated wastewater in the total volume of wastewater discharged amounted to 84.5% (2019 – 84.5%; 2020 – 84.7%).
At the beginning of 2022, there were 558 enterprises operating throughout the Republic providing services for the collection, treatment and distribution of water, as well as the collection and treatment of wastewater. Of these, 155 (27.8%) were state-owned коммунal enterprises, while 403 (72.2%) were privately owned.
These enterprises manage 623 wastewater disposal facilities and 271 separate wastewater disposal networks, including 245 treatment facilities. The length of main collectors amounted to 4.9 thousand km.
At the same time, the most pressing issues in the коммунal infrastructure system today remain the high level of network deterioration and the unsatisfactory condition of wastewater treatment facilities (hereinafter referred to as WTFs), which ensure the proper treatment of wastewater.
Across the Republic, 68 out of 89 cities require the construction of new WTFs, as well as their modernization and reconstruction.
Other pressing issues include a shortage of qualified personnel and insufficient labour resources in the sector due to low wages.
2. Heat Supply
The total length of heating networks across the Republic increased by 0.3 thousand km between 2019 and 2022 (2019 – 13.6 thousand km; 2022 – 13.9 thousand km).
The share of networks requiring repairs decreased from 61% to 54% between 2019 and 2022.
The heat energy supply sector is represented by energy supply organizations that purchase heat energy from heat-generating organizations and subsequently sell it to consumers.
In most regions, energy transmission organizations also carry out energy supply activities.
Heat energy supply is provided only through centralized and local heating systems.
Heat sources in centralized and local heating systems are divided into combined heat and power plants and boiler houses.
In 2021, the number of heat supply sources in the Republic amounted to 2,801 units, while the number of autonomous heat sources amounted to 425 units.
The total installed capacity of heat sources in Kazakhstan as of January 1, 2023 amounted to 37,566.7 gigacalories per hour.
In 2022, heat energy generation amounted to 95.6 million Gcal, of which 55.9 million Gcal accounted for by thermal power plants and 32.6 million Gcal by boiler houses.
The number of subscribers connected to heating networks amounted to 1,547,002, including 1,486,373 household consumers (households).
Between 2019 and 2022, 60 projects involving the construction and reconstruction of 220.7 kilometres of heat, water supply and wastewater disposal networks were implemented through lending and subsidization mechanisms.
As a result of project financing, the deterioration of heat, water supply and wastewater disposal networks decreased from 57% in 2019 to 51% in 2022, while the number of accidents decreased by 14% (2017 – 44 accidents; 2021 – 38 accidents).
To ensure proper accounting of consumed resources and increase energy efficiency, work is underway to install common-household and individual heat energy and water meters.
At the beginning of 2023, 76% of the housing stock of the Republic was equipped with heat energy and water meters.
A low level of provision with common-household heat energy and water meters, ranging from 21% to 54%, is recorded in the Kyzylorda, East Kazakhstan, Pavlodar, Karaganda, Abai and Zhetysu Regions.
According to expert estimates, the current total demand for common-household heat energy and water meters amounts to 18.7 thousand units, while 59.5 thousand units have been installed.
3. Electricity Supply
The installed capacity of power plants of the Unified Electric Power System of the Republic of Kazakhstan as of January 1, 2023 amounted to 24,524 MW, while available capacity amounted to 19,024 MW.
Electricity production in the country is carried out by 204 power plants of various ownership forms. In 2022, 113 billion kWh of electricity was generated, of which 14.8 billion kWh was used in the housing sector.
In the electricity supply sector, the level of provision with metering devices is 100%, but most of them are outdated and do not meet energy efficiency requirements.
Modern household appliances and electrical installations operating at low currents are not registered by induction meters, the mechanism of which has a high margin of error at negative outdoor temperatures characteristic of most of the country's territory. This results in commercial losses in internal building networks, while some deterioration of the metering device creates self-running errors.
At present, induction meters have not been excluded from the State Register of Measuring Instruments, are accepted for verification and, as a result, continue to be used. At the same time, these models of meters need to be gradually phased out and replaced with meters equipped with remote data-reading capabilities.
4. Gas Supply
The country's gas transmission system has an extensive infrastructure of main gas pipelines with a total length of 20.6 thousand kilometres and a transmission capacity of 255 billion cubic metres of gas per year, as well as gas distribution networks exceeding 59 thousand kilometres in length. This infrastructure provides gas transportation for the population of the western, southern and central regions of the country and also has promising transit potential for transporting gas from Uzbekistan and Turkmenistan (to Russia and China).
Expansion of the gas pipeline network is one of the objectives of state infrastructure development policy. It is planned to provide the city of Astana, the Akmola Region and the Karaganda Region with access to the gas network by 2030.
Three regions remain without access to gas networks: Pavlodar, North Kazakhstan and East Kazakhstan.
As of January 1, 2023, the level of gasification of the country's population reached 59%, or 11.6 million people had access to natural gas (2020 – 51.5%; 2021 – 57.67%).
The number of gas regulating stations amounted to 2,149 units, and the number of cabinet-type gas regulating stations amounted to 93,672. The length of the gas network amounted to 34,829.7 km, of which 22,175.6 km consisted of intra-block (intra-yard) networks.
Between 2017 and 2021, 9,123.7 km of gas networks were constructed.
5. Solid Household Waste Disposal
In 2021, according to statistical data, approximately 4.2 million tonnes of solid household waste (hereinafter referred to as SHW) were generated in the country, of which 3.2 million tonnes consisted of коммунal waste collected by specialized enterprises and individual entrepreneurs engaged in the collection and transportation of коммунal waste, whose number amounted to 676.
The main share consisted of household waste (65.6%), while 20.2% accounted for production waste (equivalent to household waste), 10.5% for street litter, and 2.2% for market waste.
In urban areas, the main generators of коммунal waste are not only households but also enterprises and organizations.
Overall, access of the population to waste collection and removal services is acceptable only in large cities. Small cities and rural areas are characterized by the absence or insufficient provision of such services and their low quality.
The majority of SHW in Kazakhstan is transported and deposited at open dumps without prior separation, which causes contamination of soil, surface and groundwater, and atmospheric air, as well as unpleasant odours. At the end of 2022, the share of recycled and recovered SHW amounted to 26% (2021 – 21.1%).
According to the results of satellite monitoring in 2022, 5,683 unauthorized waste disposal sites were identified (2021 – 7,328; 2020 – 8,884), of which 4,325 were eliminated (2021 – 6,740; 2020 – 7,147).
The largest number of identified illegal dumps was observed in the Akmola Region – 830 (91% eliminated), Karaganda Region – 745 (98% eliminated), and Turkestan Region – 428 (88% eliminated).
Insufficient work on eliminating such sites is being carried out in the Abai and Ulytau Regions.
The absence of a waste sorting system involving the population, as well as the lack of specialized sites and the remoteness of landfills, lead to an increase in unauthorized dumps. An insufficient number of enclosed container sites, as well as the deterioration of containers, result in unsanitary conditions around multi-apartment residential buildings.
Biodegradable waste (hereinafter referred to as BW) places a significant burden on the environment, since its decomposition generates landfill gas that affects climate change, while the decomposition products of BW contribute to the formation of pathogenic microflora. At present, all BW is transported to landfills without prior neutralization. Technological solutions for the disposal of this part of waste depend on waste volumes and climatic conditions. If the volume of generated BW increases, it may become possible to construct biogas facilities in combination with waste obtained from wastewater treatment (waste activated sludge from wastewater treatment facilities), since the safe and efficient disposal of waste activated sludge is itself a problem faced by most wastewater treatment enterprises.
Overall, the share of waste sorting and recycling across the country is extremely low, and there is a lack of capacity for generating “green” energy.
The introduction of separate collection technology for коммунal waste using a two- or three-container system will significantly reduce environmental and air pollution in the surrounding areas by reducing the generation of toxic gases at landfills.
In 2022, separate waste collection at various stages was introduced in 142 settlements, while sorting collection was introduced in 103 settlements.
At present, measures are being taken in the Republic aimed at reducing the negative impact of waste on the environment.
There are 3,019 landfills operating throughout the Republic, and 322 waste paper collection points for recycling have been opened.
The main problems hindering the expansion and timely renewal of коммунal infrastructure are:
- inconsistency of existing коммунal tariffs with the actual financial resources required for the modernization of коммунal infrastructure;
- unattractiveness of коммунal infrastructure systems and facilities in small and medium-sized cities with a small number of consumers to investors;
- shortage of qualified personnel and lack of reliable information on the length and condition of коммунal infrastructure networks broken down by region;
- low level of introduction of new technologies in the housing and коммунal services sector;
- low level of public awareness of the advantages of new technologies and resource consumption metering systems.
2.2. Assessment of the State of Housing Infrastructure
1. Assessment of Housing Construction Development
Between 2020 and 2022, according to statistical data, 47.6 million square metres of new housing (420 thousand residential units) were commissioned across the Republic, including:
- in 2020 – 15.3 million square metres (140 thousand residential units), including 3.5 million square metres in rural areas;
- in 2021 – 16.9 million square metres (149 thousand residential units), including 3.7 million square metres in rural areas;
- in January–December 2022 – 15.4 million square metres (131 thousand residential units), including 3.3 million square metres in rural areas.
An increase in housing commissioning in January–December 2022 was observed in 14 regions. The most significant growth in housing construction rates compared with the previous year was recorded in the Pavlodar (132.1%) and East Kazakhstan (115.4%) Regions. Housing commissioning rates decreased in 6 regions: the city of Almaty (65.4%), Astana (75.3%), and the Ulytau (70.4%), Mangystau (84.9%), North Kazakhstan (86.9%) and Atyrau (92.2%) Regions.
At the end of January–December 2022, the housing commissioning indicator per capita amounted to 0.78 square metres. The highest housing commissioning indicator per capita was recorded in the city of Astana (1.75 sq. m), Mangystau Region (1.37 sq. m), Aktobe Region (1.35 sq. m) and Atyrau Region (1.20 sq. m). The lowest indicator was recorded in Ulytau (0.26 sq. m), Turkestan (0.41 sq. m), Zhetysu (0.42 sq. m) and East Kazakhstan (0.44 sq. m) Regions.
From January to December 2022, investment in housing construction increased by 16.8% compared with 2021 and amounted to KZT 2.9 trillion.
For every KZT 1 of public funds, KZT 9 of private investment was attracted.
Large-scale housing construction had a multiplier effect on the development of the construction industry and the growth of domestic construction materials production. At the end of 2022, the production of construction materials increased by 101.3% and amounted to KZT 1,133.4 billion (2020 – KZT 732.2 billion; 2021 – KZT 965 billion). The industry's share in the structure of the manufacturing industry amounts to approximately 5.6%.
According to statistical data, at the beginning of 2023 the country's housing stock amounted to 405.2 million square metres of total housing floor area (5.7 million residential units), having increased by 4.5% compared with 2021.
The urban housing stock comprises 263.9 million square metres of total housing floor area (3.9 million residential units), while the rural housing stock comprises 141.2 million square metres (1.8 million residential units).
At the same time, almost the entire housing stock (97.7%) is privately owned by the population of the country, while only 2.3% is state-owned.
The total residential floor area per resident in 2022 increased by 6.8% compared with 2018 (21.9 sq. m) and amounted to 23.4 sq. m (in cities – 25.8 sq. m; in rural areas – 19.8 sq. m).
The highest residential floor area per resident is recorded in the cities of Astana (30.5 sq. m), Almaty (29.1 sq. m), Shymkent (27.4 sq. m), and the Mangystau (27.8 sq. m) and Atyrau (24.3 sq. m) Regions.
To stimulate housing construction through public investment, between 2017 and 2022 engineering communications were provided in areas of mass housing development, including the provision of utilities to 225.7 thousand land plots allocated to citizens for the construction of individual housing.
The largest number of land plots provided with utilities was recorded in the Aktobe (65,275), Turkestan (36,840), Atyrau (17,655) and Kyzylorda (23,448) Regions.
As part of state support measures for private developers, between 2017 and 2022 interest expenses on loans were reimbursed in the total amount of KZT 10.9 billion.
A total of 23,318 apartments with a total area of 1.7 million square metres were constructed using subsidized loans (158 projects), of which 12,020 apartments were sold at fixed prices.
Within the framework of housing stock renovation programmes, 114 MARBs were demolished in 6 regions of the Republic.
In the capital, with the participation of private investors and public investment, the construction of 120 MARBs involving 14 thousand equity holders was completed.
2. Assessment of Economic Support Measures for the Population in Resolving Housing Issues
The determining factors of housing affordability for the population are real estate prices and the corresponding purchasing power of the population.
According to statistical data, at the end of the fourth quarter of 2022, the average monthly nominal wage across the Republic amounted to KZT 338.7 thousand, having increased by 22.8% compared with 2021.
The highest wages were recorded in the city of Astana (KZT 469.3 thousand), Ulytau Region (KZT 448.9 thousand), Atyrau Region (KZT 556 thousand) and Mangystau Region (KZT 509 thousand).
From January to December 2022, the price of newly built housing increased by 15.6% compared with the same period in 2021, while the price of resale of comfortable housing increased by 21.6%.
Furthermore, rental rates for comfortable housing demonstrated an increase in the annual growth rate and, at the end of 2022, increased by 45%, which was caused by the situation in Russia related to partial mobilization and a significant influx of citizens of that country.
Table 1
| Name | 2020 | 2021 | 2022 ||---|---:|---:|---:|| | At the end of the period, KZT per 1 sq. m | Compared with December of the previous year | At the end of the period, KZT per 1 sq. m | Compared with December of the previous year | At the end of the period, KZT per 1 sq. m | Compared with December of the previous year || Sale of new housing | 307600 | 105% | 361269 | 116.6% | 437459 | 115.6% || Resale of comfortable housing | 228218 | 113.2% | 290042 | 124.3% | 482197 | 121.6% || Rental payment | 1639 | 108.1% | 1928 | 117.5% | 4678 | 145% |
Source: Bureau of National Statistics of the Agency for Strategic Planning and Reforms of the Republic of Kazakhstan.
To maintain the purchasing demand of the population, various mortgage lending instruments of financial institutions and the housing construction savings system are being implemented, allowing citizens with different income levels to resolve their housing issues (“Own Home”, “Zhas Otbasy”, “Military Housing”, “Military Product”, “Uymai”, “2-10-20”, “5-10-20”, the “7-20-25” mortgage housing lending programme, and regional preferential lending programmes).
As of January 1, 2023, the total mortgage loan portfolio amounted to KZT 5.1 trillion, of which 65,975 mortgage housing loans worth KZT 880.3 billion were issued under the “7-20-25” mortgage programme, while the housing construction savings system accounted for KZT 2.9 trillion (in 2021 – KZT 3.8 trillion; the Otbasy Bank portfolio – KZT 2 trillion).
At the end of December 2022, the weighted average interest rate on loans for the construction and purchase of housing by citizens amounted to 9.8% (2021 – 8.2%; 2020 – 7.6%).
Within the framework of the pension savings campaign, as of January 1, 2023, KZT 3.2 trillion had been used to improve housing conditions under 1.3 million applications submitted by citizens (906 thousand applicants), including:
- KZT 791 billion for the fulfilment of obligations under mortgage housing loans (331 thousand applicants);
- KZT 260 billion for replenishing housing savings deposits (189 thousand applicants);
- KZT 2 trillion for final settlement when acquiring housing into ownership (348 thousand applicants);
- KZT 94 billion for other purposes, including the construction of individual housing, lease agreements, privatization, instalment payments and shared participation in housing construction (37 thousand applicants).
As part of state support measures between 2017 and 2022, 196.8 thousand citizens improved their housing conditions through the provision of preferential loans (2%–5%), rental housing and credit housing provided by local executive bodies and quasi-public sector entities.
Despite the measures being taken, there is a constant increase in the number of citizens seeking social support measures, which is due to low purchasing power and imperfections in housing legislation (from January to December 2022, their number increased from 553 thousand people to 592 thousand people, i.e. by 105.9%).
Between 2019 and 2022, akimats issued 8,088 housing certificates to cover part of the initial down payment on mortgage housing loans amounting to KZT 8.4 billion for the purchase of housing.
Public relations related to activities involving shared participation in the construction of residential houses (residential buildings) through the attraction of funds from individuals and/or legal entities are regulated by the Law of the Republic of Kazakhstan “On Shared Participation in Housing Construction”.
Between 2016 and 2023, private developers attracted funds from equity holders for 806 facilities, of which construction was completed at 493 facilities and construction is ongoing at 313 facilities.
At the same time, one of the pressing problems is the construction of facilities in circumvention of current legislation. As a result of illegal actions by developers, 16 thousand citizens suffered losses.
Despite all efforts being made, problems with shared housing construction have not been fully resolved. As of March 2023, 44 problematic housing construction facilities involving 6,789 equity holders still need to be completed.
Furthermore, under conditions of urbanization and labour migration, there is no effective mechanism for civilized relations in the rental housing market, leaving the rights of both tenants and landlords unprotected.
According to sociological surveys, the shadow rental housing market accounts for 60–70% of the total market, despite various liberal tax conditions for conducting business activities involving the rental of real estate (patents, simplified forms for individual entrepreneurs, the single aggregate payment, and a 10% rate on taxable income).
3. Assessment of the Current State of the Housing Stock
According to statistical data, there are 2.5 million residential buildings in the Republic, including 311,541 multi-apartment residential buildings.
According to local executive body data, there are 54,731 MARBs across the Republic, one-third of which were built before 1970 (50 years or more ago), and approximately 65% of the housing stock was commissioned more than 25 years ago.
Certain types of repairs are required for 17,044 MARBs, while 752 MARBs (1.4%) are subject to demolition as unfit for habitation.
Using public investment, 3,571 MARBs were repaired between 2011 and 2022.
Measures taken to maintain the condition of the existing housing stock made it possible to reduce the share of MARBs requiring major repairs to 31.1% by 2023 (2021 – 31.6%; 2020 – 21.5%).
Elevator operation is also an important issue. There are currently 33,858 elevators in the housing stock, of which 3,937 are subject to replacement and 2,407 require major repairs as part of technical maintenance, with subsequent extension of their service life by 25 years.
There are 150 organizations specializing in elevator maintenance services operating in the country, as well as 3 enterprises manufacturing elevator equipment with a designed production capacity of 200–1,000 units per year.
Between 2017 and 2022, domestic manufacturers produced 3,278 elevators.
At the same time, resolving the problem of proper maintenance and preservation of the housing stock is impossible without the active participation of apartment owners, since 97.8% of housing is privately owned.
At present, the fundamental principles of management and economic administration of condominium facilities, as well as state control in the housing stock sector, are defined by the sector-specific Law of the Republic of Kazakhstan “On Housing Relations” (hereinafter referred to as the Law).
In accordance with this Law, property owners are transitioning to new forms of management, which cover 46,714 MARBs across the Republic, of which new forms of condominium management have been established in 45,425 MARBs (97.2%).
The key problems today are the low level of activity of owners in making decisions on the management of their buildings, the absence of a sufficiently effective mechanism for accumulating funds for major housing repairs, which is due to the complexity of voting procedures and limited electronic services.
The main problems in the housing infrastructure sector are:
- limited financial capacity of citizens to improve their housing conditions through mortgage programmes due to high interest rates, low purchasing power of the population, and the absence of growth in real incomes;
- high construction costs associated with the purchase of construction materials, land plots and equipment rental;
- insufficient domestic production of construction materials;
- absence of the principle of an “effective owner”, qualified specialists in the housing stock management system, and effective supervisory mechanisms for housing inspections;
- the “shadow” rental housing market and the attraction of citizens' funds in circumvention of legislation on shared participation in housing construction;
- inefficient use of territories suitable for housing construction, difficulties in withdrawing unused land plots and a lack of vacant plots for development;
- complete absence of utilities in newly developed areas, with the commissioning dates of infrastructure facilities not synchronized with the construction schedules of residential buildings;
- chaotic development of territories, which increases the burden on existing infrastructure and leads to a shortage of socially significant facilities and deterioration in the quality of the urban environment;
- numerous amendments to urban planning documents and inconsistency between urban planning documents and socio-economic development documents;
- outdated housing stock requiring reconstruction and renovation.
3. Review of International Experience
3.1. коммунal Infrastructure
An examination of the experience of foreign countries has demonstrated that the mechanisms most suitable for the conditions of the country for implementing projects aimed at the development and modernization of коммунal infrastructure involve public investment (targeted transfers and subsidies), based on the experience of European Union countries.
At the same time, in most foreign countries, management in the housing and коммунal services sector (hereinafter referred to as HCS) is considered a separate type of entrepreneurial activity, for which a management organization receives remuneration from property owners, while responsibility to them for building maintenance is borne by an association (association, partnership) of homeowners.
In Finland, all коммунal infrastructure is municipally owned by the city, while many power plants are privately owned and heat supply is centralized. In addition, city residents have the right and technical ability to choose from whom to purchase services based on the most favourable terms.
Companies engaged in electricity, gas and water supply, wastewater disposal, waste collection and recycling, and all industrial waste management operate under contracts with municipalities.
There are different types of contracts: some provide only for the operation of the specified systems, others provide for responsibility for repairs, and still others provide for the construction of new facilities, including the construction of HCS infrastructure for new urban districts. Contracts for operation and construction are awarded through tenders conducted by municipalities with regular monitoring.
Almost 65% of water supply and sanitation projects used European Union grants to prepare the necessary project documentation (feasibility studies, cost-benefit analyses), support the establishment and operation of project implementation units, build the capacity of local authorities and improve their organizational efficiency, as well as improve the operation and maintenance of existing systems.
According to the experience of foreign countries, many water supply and wastewater disposal infrastructure projects are implemented through public-private partnerships (hereinafter referred to as PPPs).
For example, the “Dutch model” involves state ownership and management of the HCS system through the establishment of a private enterprise. Under the “French model”, state-owned HCS assets are transferred to private sector management through PPP mechanisms.
At the same time, the application of these models depends on effective tariff policy and the condition of engineering infrastructure.
Transferring facilities with a high degree of deterioration into trust management may cause a significant increase in tariffs in order to attract investment for network replacement. To this end, state support measures must be strengthened, especially with regard to socially vulnerable groups of the population in the event of a significant tariff increase.
The “British model” involves the transfer of HCS facilities into private ownership and management through the privatization of all state assets in the HCS sector. The role of the state is limited to regulation and support of the sector.
In the Republic, following the example of the “British model”, HCS entities were transferred into private ownership within the framework of the Comprehensive Privatization Plan for 2021–2025. At the same time, this approach also entails certain risks related to insufficient private investment in the maintenance and development of infrastructure by private owners, as well as deterioration in the quality of services.
In Kazakhstan, it is planned to apply different models to each HCS facility depending on the condition of its infrastructure and the specific characteristics of the enterprises.
To implement projects for the modernization of коммунal infrastructure, Russia operates the Fund for Assistance to the Reform of Housing and коммунal Services, which provides financing through the resources of the National Wealth Fund.
To ensure the reliable operation of коммунal systems, reduce network losses and accident rates, and reduce costs, countries such as the United States, the United Arab Emirates, South Korea and Singapore have automated and digitized production processes in heat supply, water supply and wastewater disposal systems.
In this area, Kazakhstan plans to automate the activities of water supply and wastewater disposal enterprises using the state budget.
For Kazakhstan, international experience in the introduction of digital technologies in the housing and коммунal services sector is of interest, as it will become a priority measure for the development of коммунal infrastructure in the near future. Experience in attracting investment for the development of коммунal infrastructure will be applied as part of the improvement of tariff policy.
3.2. Housing Infrastructure
An examination of the experience of foreign countries has revealed a number of similar instruments used in the Republic to address housing issues faced by the population.
For example, based on the experience of the United Kingdom and Canada, assistance is provided to certain groups of the population in purchasing housing through the construction of social housing, preferential loans and housing certificates. In addition, based on the experience of Canada and OECD countries, housing rental subsidies were introduced in 2022 for housing in the private housing stock.
For independent housing construction, engineering utilities are connected to land plots based on the experience of Chile.
In the United Kingdom, the Affordable Homes Programme 2021 to 2026 is being implemented. Housing provision is based on a points system and is intended for those most in need. According to the latest assessment, the social housing stock in the United Kingdom amounts to approximately 4 million apartments and houses, while the number of people waiting for housing exceeds 1.2 million. The rental cost of social housing is significantly lower than the market price (up to 80% of the market price). After a certain period of residence, tenants of municipal housing have the right to purchase the housing, and the purchase price depends on the period of residence. The Government of the United Kingdom also provides assistance to certain groups of people in purchasing housing. Thus, under the “Homebuy” scheme, equity loans amounting to 25% of the purchase price of the property are provided, which are repaid upon resale of the housing in an amount equal to 25% of the property's value at the time of sale. No interest is charged on these loans.
Canada has a programme called the “National Housing Strategy for 2019/20–2029/30”, which is aimed at providing assistance to citizens of the country in need of affordable modern housing, as well as providing mortgage loans to stabilize the housing market.
The programme provides for the construction of 100 thousand residential houses to provide housing for 530 thousand families, as well as rental subsidies and housing allowances. Rent is subsidized if the rental cost of housing exceeds 30% of a family's income before taxes.
In Chile, the construction of partially completed houses is carried out. The idea is to provide an opportunity to independently expand the floor area of the housing.
In almost all countries of the Organisation for Economic Co-operation and Development, housing support is provided through housing benefits, which account for between 0.6% and 1.8% of GDP. OECD countries mainly support the provision of social rental housing.
By the mid-1970s, Sweden had achieved the highest housing quality standards in the world through the implementation of the “Million Homes Programme”. The programme consisted of two components: rental subsidies and direct financing of construction from the state budget with the participation of the Central Bank of Sweden.
The housing model in the Netherlands is based on housing associations, which provide 80% of social rental housing. Social housing in the Netherlands is provided through registered social housing organizations, which are private non-profit organizations legally entrusted with the task of prioritizing the provision of housing to families with lower incomes.
Real Estate Investment Trusts (REITs) have become widespread in OECD countries. These are private companies (funds) that use collective investments (units, shares) to acquire real estate or mortgage securities (mortgages, mortgage bonds), which are subsequently leased out for profit.
Following the experience of Russia and Turkey, the Kazakhstan Housing Company (an analogue of “Dom.RF”) was established, specializing in attracting investment in housing construction through various mechanisms.
To provide comprehensive support to the housing sector and ensure affordable housing for citizens of Russia, the unified housing development institution “Dom.RF” was established in 2018. It ensured the development of the mortgage lending market through the issuance of mortgage-backed bonds amounting to RUB 1.7 trillion. In addition, bond borrowing is provided for the implementation of infrastructure projects aimed at developing the rental housing market, providing developers with land resources and creating a comfortable urban environment.
Within the framework of the state programmes implemented by DOM.RF, including the “Far Eastern Mortgage”, the “Mortgage Rate Subsidy Programme for New Buildings”, the “State Support Programme for Families with Children”, the “Interest Rate Subsidy Programme for Housing Construction Projects – Assistance to Developers”, and rental projects, approximately 2 million families improved their housing conditions.
Over the past decade, housing construction policy in Turkey has entered a new stage in the context of the establishment of a unified housing operator, “TOKİ”. The main focus is on low-rise development with an emphasis on “horizontal urbanization” (50 thousand housing units). Social housing is intended for low-income families, and monthly payments depend on wage growth rates in the public sector and inflation. Mortgage terms under “TOKİ” are established depending on the financial capacity of the family (on average, from 10 to 20 years).
Following the experience of Russia, Japan and Germany, programmes for major repairs of MARBs and the renovation of “old neighbourhoods” are being introduced.
The policy of European countries is aimed at reconstructing and modernizing the old housing stock. Other countries, such as the United States, Japan and Turkey, have replaced old neighbourhoods with new ones.
Based on foreign experience, the transition to new forms of condominium management was introduced on a legislative basis in 2020.
In Germany, the legislation defines the organizational principles of housing cooperatives of homeowners, which operate on a non-profit basis. In order to accumulate funds for minor or major repairs of buildings, as well as common areas, a коммунal fund is maintained. Every year, at meetings of building management bodies and owners, decisions are made regarding the planned activities to be carried out in the building (painting the facade, installing an elevator, repairs, construction of a playground, etc.) and the amount of funds that owners will contribute to the коммунal fund.
In Russia, as in Kazakhstan, the housing inspectorate performs supervisory and control functions. At the same time, the Russian system differs in that it has centralized housing supervision, which makes it possible to fully ensure proper control over the preservation of the housing stock.
For Kazakhstan, foreign experience in the development of the rental housing market with the involvement of institutional investors, the introduction of digital tools, and mechanisms for managing and preserving the housing stock is of interest.
4. Vision for the Development of Housing and коммунal Infrastructure
The Concept for the Development of Housing and коммунal Infrastructure for 2023–2029 (hereinafter referred to as the Concept) has been developed in accordance with the System of State Planning in the Republic of Kazakhstan and defines the main areas for ensuring comfortable living conditions for the population.
The measures being taken will be aimed at renewing and expanding the housing stock, modernizing and developing коммунal infrastructure. The introduction of intelligent systems and digital technologies will be aimed at meeting the main expectations and interests of the population of the country and will contribute to increasing equal access to basic life-sustaining services.
A revision of approaches to the formation of tariff policy will ensure the attraction of investment into the коммунal sector.
The introduction of digitalization and intelligent systems will make it possible to replace universal supervision with smart control, thereby ensuring a more effective management and control system.
Within the framework of decarbonization measures, the reliable operation and energy efficiency of коммунal systems and the housing stock will be ensured.
The use of energy-saving technologies and the installation of metering devices in the коммунal sector will lead to a reduction in losses and lower коммунal service expenses for consumers.
In the coming years, a balanced policy of housing construction in the regions will continue, taking into account urban planning and the availability of engineering infrastructure. The volume of land plots brought into circulation for housing construction will be increased, and conditions will be ensured for the development of domestic manufacturers with guaranteed demand volumes.
Support for individual housing construction, infrastructure provision for development areas and the creation of a comfortable environment, as provided for within the framework of the Concept, will make it possible to increase the intensity of development of rural territories.
The main instruments for further improving the housing conditions of the majority of the population will be a civilized rental housing market, shared participation in housing construction, an affordable interest rate on mortgage loans and targeted subsidies, with the formation of a model of shared social responsibility between businesses and citizens.
An important condition for creating stable demand and maintaining the pace of housing construction and mortgage lending is ensuring growth in the real incomes of the population.
Measures will be implemented to provide the housing and коммунal services sector and the construction industry with personnel, scientific support and resources.
The establishment of unified information and analytical centres will ensure intersectoral coordination and an operational and effective system for making management decisions.
The authorized body in the field of ecology will take systematic measures to prevent the formation of illegal dumps and eliminate existing ones through the introduction of regulatory requirements, licensing of enterprises engaged in the processing and disposal of hazardous waste, the development of environmental culture and education, the digitalization of environmental information, and the introduction of systems for separate collection and recycling of household waste.
The development of housing and коммунal infrastructure in settlements will be carried out taking into account the characteristics of each region and the parameters of the system of regional standards, which provide for a specific list of services and benefits (from 29 to 49 for rural districts, villages, district centres and cities of district significance, and 56 for cities of regional and national significance).
Overall, the most important functional aspect of the development of comprehensive infrastructure and comfortable housing will be the improved architectural appearance of settlements, the renewal of existing housing and коммунal infrastructure and the housing stock, and an increase in the quality of housing and коммунal services.
5. Main Principles and Approaches
The main objective of the Concept is to ensure the development of comprehensive коммунal infrastructure and comfortable housing in order to improve the quality of life of the population and provide equal access to basic services.
The fundamental principles of housing and коммунal infrastructure development are:
- the principle of “human-centredness” – ensuring a minimum mandatory level of accessibility of facilities and services (benefits) for the population depending on the type (city or village) and size (population) of settlements;
- the principle of consistency and efficiency – consideration of all elements to ensure interaction and minimize costs, including the development of social partnership, technical and tariff policy, and institutional reforms aimed at improving the quality of basic life-sustaining services;
- the principle of operational reliability and environmental sustainability – development must be aimed at operating коммунal infrastructure facilities and residential buildings while ensuring their normal technical condition, safe and comfortable living conditions, and compliance with sanitary and technical standards and construction requirements.
To achieve the objective and implement the principles, the following approaches have been defined:
1. Improving the quality of housing and коммунal services through the development of the коммунal sector.
This approach provides for the development of wastewater disposal, water supply and heat supply sectors through the use of project financing, attraction of investment, energy-efficient technologies and digitalization.
2. Increasing housing affordability for broad segments of the population through the development of housing infrastructure.
In accordance with this approach, the necessary measures will be implemented to stimulate housing construction, renew the housing stock and determine further policy on providing housing to low-income citizens.
In implementing the specified approaches, the “people to infrastructure” model will continue, with the provision of a “budget filter” (priority financing).
The mechanism for reviewing and selecting projects will be implemented within the framework of the current provisions of budget legislation and sectoral legislative acts in the fields of energy, housing relations, water resources and shared participation in housing construction.
Final recipients of budget subsidies, grants and loans will be required to provide control and audit entities with complete information on the volumes and targeted expenditure of funds.
Ensuring the development of коммунal and housing infrastructure is linked to the formation of an urban planning system, including high-quality urban planning projects at all levels (master plans, detailed planning projects and development plans).
To create a unified, continuously updated reference database of the urban planning cadastre, work will be carried out to develop the IS USUPC.
Approach 1. Improving the Quality of Housing and коммунal Services through the Development of the коммунal Sector
To improve the quality of коммунal services and ensure the reliable operation of коммунal systems in the wastewater disposal, water supply and heat supply sectors, the following measures will be taken.
1. Institutional Measures
Sectoral laws will be adopted to ensure effective regulation of infrastructure in the field of water resources and heat energy.
To ensure the effective implementation of measures for the development of heat, water supply and wastewater disposal systems, mandatory technical inspections of the condition of engineering infrastructure will be provided for, as well as the development and approval of development plans by local executive bodies.
To ensure intersectoral coordination among authorized state bodies involved in the provision of services in the housing and коммунal services sector, a National Centre for Housing and коммунal Infrastructure will be established on the basis of JSC “Kazakhstan Centre for Housing and коммунal Services” (hereinafter referred to as the Kazakhstan Centre for HCS).
The Kazakhstan Centre for HCS will play an active role in the development of the heat supply, water supply and wastewater disposal sectors, performing the following main functions: increasing the investment attractiveness of housing and коммунal services for the purpose of modernization and development; conducting analytical and scientific research; introducing innovative technologies in the housing and коммунal services sector; and determining the optimal model for the modernization and development of housing and коммунal services.
Local executive bodies will ensure the development and approval of regional plans for the implementation of investment projects involving the construction, reconstruction and modernization of heat, water supply and wastewater disposal systems, electrical networks of regional electric grid companies in коммунal ownership, metering, automation and digitalization (hereinafter referred to as the regional plan), indicating information on the actual technical and economic condition of networks and facilities, sources of financing and phased implementation deadlines.
To develop the regional plan and obtain complete and reliable information on the actual technical and economic condition of коммунal infrastructure facilities, an audit of the condition of heat supply, water supply and wastewater disposal networks will be conducted.
2. Implementation of Infrastructure Projects through Budget Financing
The project financing method will be applied to the construction of new facilities and the modernization and reconstruction of existing facilities using funds from the republican and local budgets (subsidies, targeted transfers and budget loans).
The main criteria for project financing will be:
- the absence of facilities (systems) in a settlement or the actual degree of deterioration of facilities (systems) of at least 50%;
- the use of modern materials, equipment, devices and technologies that meet reliability and maintainability requirements and ensure remote system control;
- the absence of negative environmental impacts, including the discharge of wastewater into rivers and lakes;
- population size.
Projects involving wastewater disposal systems in large rural settlements with high development potential will be implemented as a priority.
By the end of 2025, 27 cities and 432 rural settlements will be provided with centralized water supply, while 963 rural settlements with a population of up to 200 people will be provided with integrated block modules and water distribution points.
The deterioration of wastewater disposal, water supply and heat supply networks will be reduced from 51% to 40% by 2029.
3. Creating Conditions for Increasing Investment Attractiveness through Financial Instruments, Tariff Policy and Tax Incentives
The mechanism for financing projects involving the construction, reconstruction and modernization of heat, water supply and wastewater disposal systems through budget funds, loans from financial institutions, own funds of natural monopoly entities (hereinafter referred to as NMEs) and other sources will be structured according to the principle of “Tariffs in Exchange for Investment”.
In addition, the “Tariffs in Exchange for Investment” mechanism will make it possible to attract additional investment into the коммунal sector and stimulate the restoration of deteriorated networks and equipment.
The possibility of introducing a mechanism to stimulate NMEs through the establishment of property tax benefits for newly constructed (modernized) коммунal infrastructure facilities will be considered.
Projects for the construction and modernization of wastewater treatment facilities will be implemented in 68 cities using the own funds of NMEs, budget financing, loans from international financial organizations (hereinafter referred to as IFOs) backed by a state guarantee of the Government, PPPs, and bond loans of quasi-public sector entities.
For projects intended to be jointly financed with financial institutions, the Kazakhstan Centre for HCS, acting as the operator, will coordinate with financial organizations on the preparation of HCS projects, structuring financing schemes and project implementation.
To reduce the burden on tariffs, it is planned to subsidize the costs of organizations associated with the repayment and servicing of loans from republican and local budgets, with a gradual annual reduction in the amount of subsidies from the state budget. As a result, the total amount of subsidies from the republican budget must not exceed the principal amount of the loan attracted.
A new subsidy mechanism will be developed by the authorized body to subsidize water utilities' costs associated with servicing and repaying loans from other sources.
To enable water utilities to obtain a state guarantee and repay non-governmental loans through payments from republican and local budgets, the possibility of including wastewater treatment facility projects in the list of socially significant projects approved by authorized bodies for state planning and budget execution will be considered.
Within the framework of republican budget funds, priority consideration will be given to wastewater treatment facilities in коммунal ownership, under management, economic jurisdiction or on the balance sheets of organizations in which 50% or more is owned by the state and which will be transferred into коммунal ownership after commissioning.
Reconstruction, including technical re-equipment, modernization and expansion of wastewater treatment facilities in private ownership, will be provided for through extra-budgetary investment, including investment programmes of NMEs.
To prevent the construction of excessive capacities and inefficient expenditure of budget funds, the main criteria and parameters for wastewater treatment facility projects will be developed, with automation and digitalization of technological processes and determination of the optimal capacity of the facilities being designed.
Financing from republican and local budgets will be provided for the automation and digitalization of technological processes in heat supply, water supply and wastewater disposal.
4. Introduction of New Technologies and Digitalization of the Sector
To facilitate the transfer and development of new technologies (anti-corrosion and energy-efficient technologies) in the HCS sector, research and development activities will be actively implemented, accompanied by improvements to scientific and technical documentation.
During design, technologies and advanced technical solutions based on modern scientific and technical developments and experimental research included in the Unified State Register of New Technologies in Construction will be applied.
To reduce the tariff burden and increase the investment attractiveness of NMEs specializing in wastewater treatment, technologies will be introduced for generating electricity through biogas plants, reusing treated wastewater for technical water supply and irrigation, and generating additional income through the sale of processed sludge deposits (for use as fertilizers and in construction).
Quality control of the services provided will be ensured through the introduction of control and measuring equipment and scalable data collection and operational dispatch control systems.
Starting in 2024, NMEs will gradually introduce the SCADA/EMS system, which will provide real-time resource accounting, identify losses and determine the need for modernization of the relevant infrastructure.
The experience of automating the production processes of LLP “Water Resources – Marketing” at the water utility in the city of Shymkent will be scaled up.
The information systems of NMEs will be integrated with the information system for centralized collection and storage of electronic information resources in the field of housing relations and housing and коммунal services (hereinafter referred to as the Centralized Collection Information System), which will provide consolidated information on the entire HCS sector.
Information regarding the housing stock and residents, energy consumption, the current condition of HCS facilities and engineering utilities will be digitized and made available to users through electronic resources and information systems of sector entities, with subsequent transfer to the Centralized Collection Information System, which will be transferred to the trust management of the Kazakhstan Centre for HCS.
The Kazakhstan Centre for HCS will provide NMEs with financing for equipping MARBs with common-household meters manufactured domestically using revolving funds previously allocated under financial leasing arrangements (leasing term of 48 months, interest rate starting from 4%) or by issuing targeted loans.
To create interactive maps of engineering networks and provide the public and businesses with open access to information on existing infrastructure, engineering utilities in developed territories of settlements throughout the country will be inventoried.
Approaches to providing the sector with labour resources will be conceptually revised.
Training and retraining of personnel for the HCS sector will continue both at higher education institutions and at educational institutions implementing technical and vocational education programmes, particularly in the specializations of “Water Supply and Sewerage”, “Heat Supply”, “Gas Supply” and “ коммунal Utilities Management”.
The issue of including a professional holiday for HCS employees in the list of public holidays will be considered, and professional standards for the HCS sector will be updated. This will make it possible to develop the market for professional training, retraining and internships as part of experience exchange.
To introduce advanced experience in sector management, the number of scholarships for overseas internships under the “Bolashak” programme for current HCS employees, including employees of service organizations (natural monopoly entities, коммунal service providers, service entities and management companies), will be increased.
Another key element in making these professions attractive is the issue of increasing the wages of specialists. At present, employees of the коммунal services sector receive some of the lowest wages, despite the high qualification requirements for technical specialists. To address this, a plan to increase the wages of employees in коммунal services and service sectors to the national average level will be adopted jointly with the interested authorized bodies.
To raise public awareness of the advantages of new technologies and resource consumption metering systems, information and explanatory work on energy conservation and improving energy efficiency will be carried out.
Explanations of the advantages of installing “smart” коммунal service meters will increase public interest in installing metering devices and ensure consumer protection against excessive charges through the principle of “payment for services actually provided”.
At the same time, open access to the State Register of New Technologies in the HCS sector will significantly increase public awareness of more efficient materials and equipment that ensure energy consumption savings.
Approach 2. Increasing Housing Affordability for Broad Segments of the Population through the Development of Housing Infrastructure
To ensure balanced development of housing construction and housing affordability for broad segments of the population, the following measures will be provided for.
1. Attraction of Private Investment in Housing Construction
1.1. Development of Engineering and Utility Infrastructure in Housing Development Areas
The growth in housing construction volumes in the regions of the Republic entails the need to increase the capacity of existing energy sources and construct new ones.
To stimulate construction and the timely commissioning of social housing facilities, the construction of engineering and utility infrastructure will be financed in new housing development areas using funds from republican and local budgets. This infrastructure will include electricity supply systems (including 10/0.4 kV substations), heat supply, water and gas supply engineering networks (within the boundaries of settlements), wastewater disposal (sewerage), telephone networks, engineering structures, landscaping and intra-block access roads.
When utilities are connected to housing facilities of a private developer on the basis of an agreement (defining the procedure and conditions for housing sales and monitoring), at least 50% of the housing volume for social purposes shall be sold in accordance with the standard approved by the authorized body in the field of architectural, urban planning and construction activities (hereinafter referred to as the authorized body), with the exception of landscaping.
When the private developer sells the constructed housing, the cost of on-site networks and landscaping shall be reimbursed in proportion to the housing purchased, in accordance with the standard approved by the authorized body.
The information system of JSC “Kazakhstan Housing Company” will be modified to monitor the fulfilment of reciprocal obligations by private developers.
To stimulate the development of individual housing construction, land plots will be provided with water supply, electricity and gas networks within the limits of republican budget funds.
The connection of heat supply systems, telephone networks, wastewater disposal and sewerage systems, engineering structures, intra-block roads and access roads to such plots will be carried out using local budget funds.
Local executive bodies will provide for the construction of individual residential houses for categories of citizens defined by housing and land legislation.
The provision of land plots for individual housing construction will be ensured, subject to the obligation to register the ownership rights to the residential houses constructed on them within the established period.
Conditions will be created for launching mass construction of individual residential houses using industrial methods, developing modular construction, including wooden housing construction, and stimulating the production and use of house kits.
1.2. Subsidization and Project Financing Instruments
To reduce population outflow from rural areas, the state will reimburse the costs of employers who have constructed rental houses for their employees.
Subsidies will be allocated from republican and local budget funds in accordance with budget legislation requirements, subject to the availability of supporting documents confirming that the constructed residential house has been commissioned.
Housing will be provided to employees with whom employment contracts have been concluded for a period of 5 years. Upon expiration of this period, the employer will have the right to sell the housing to the employee without taking into account the amount of the subsidy paid from the republican or local budget.
The list of rural settlements in which employers plan to construct housing will be determined by local representative bodies on the basis of proposals from local executive bodies.
Rules for subsidizing the costs of employers who have constructed housing for their employees in rural settlements will be adopted to implement this mechanism.
To reduce developers' costs, the mechanism for subsidizing part of the interest rate on loans obtained for housing construction through JSC “Kazakhstan Housing Company” will continue, subject to reciprocal requirements for the sale of at least 50% of the housing volume for social purposes from the credit funds received, in accordance with the standard approved by the authorized body.
JSC “Kazakhstan Housing Company” will implement project financing of investment projects with private developers on the principles of payment, urgency and repayment, attracting funds from domestic and international capital markets on market terms, as well as with construction and sales pricing parameters ensuring profitability and repayment of funds.
Issues of partnership with private developers based on PPP principles will be considered for the purpose of financing housing construction within the framework of comprehensive territorial development. The procedure and conditions for project implementation will be determined by JSC “Kazakhstan Housing Company” based on project profitability and repayment of funds.
1.3. Development of the Rental Housing Market
To develop the private rental housing market, taking into account international experience, institutional conditions will be created for the operation of real estate investment trusts (REITs).
REITs will generate income through the rental of residential and commercial real estate and increases in property value, with the distribution of income among shareholders (quasi-public sector entities, organizations with state participation, institutional investors and development institutions).
JSC “Kazakhstan Housing Company” will continue implementing rental housing projects under relevant memoranda (agreements) with state and non-state legal entities.
The possibility of implementing rental housing projects with or without the right to purchase, using properties held on the balance sheets of local executive bodies, will be considered in order to resolve housing issues of citizens defined by housing legislation.
1.4. Provision of Construction Materials and Introduction of New Technologies to Improve the Strength and Reliability of Residential Buildings
By the end of 2025, it is planned to implement 162 projects for the development of the construction industry.
A full-fledged elevator industry cluster will be established, consisting of research and testing centres, a training centre and high-tech elevator manufacturing facilities.
To ensure the utilization of existing housing construction plants (hereinafter referred to as HCPs), a Roadmap for 2021–2025 has been developed, with subsequent updating of the necessary measures.
Measures to reduce railway tariffs for logistics for HCP manufacturers are to be considered.
JSC “Kazakhstan Housing Company” will continue its work on promoting the online construction materials platform (www.material.kz), which allows Kazakhstani manufacturers of construction materials to create their own online storefronts displaying construction materials and their prices for construction companies.
In turn, construction companies will receive direct access to Kazakhstani construction materials without incurring costs associated with searching for manufacturers.
Overall, successful implementation of projects for the production of ceramic tiles, sandwich panels, thermal insulation materials, floor coverings (laminate), dry construction mixtures, wall materials (aerated concrete blocks, sand blocks), bricks (silicate and ceramic), marble powder, reinforced concrete products, fibre cement boards, facade materials, profiles, wall panels, expanded clay, wire rod and reinforcing steel will ensure an increase in domestic value from 64% to 80%, which will have a positive impact on reducing the share of imported construction materials by an average of 15%.
Regulatory requirements regarding the mandatory use of construction materials, equipment and products manufactured in Kazakhstan are continuously being improved.
Further work is underway on the mandatory application of BIM technologies (Building Information Modelling – TIMSO), which make it possible to reduce the material intensity of a project through the use of energy-saving technologies, construction materials and structures. This will indirectly ensure a significant reduction in operating expenses for residents associated with the maintenance of residential buildings.
To ensure widespread implementation on a legislative basis, criteria for applying building information modelling technology (TIMSO) in the design of construction facilities will be defined.
In accordance with the requirements of the regulatory and technical document, the classification of buildings by comfort level provides for the gradation of classes based on the size of the apartment and residential floor area per person, the height of residential premises from floor to ceiling, the number of living rooms, the minimum area of kitchen premises, the number and location of bathrooms and toilets, the availability of parking spaces per apartment, the provision of security systems and other indicators.
To ensure full transparency of construction work processes and improve construction quality, further integration of “E-QURYLYS” with the necessary information systems will continue.
To accelerate project implementation and decision-making on design solutions, the State Bank of Construction Projects will be populated, and cost estimation methods will be improved using consolidated standards for types of work and structural elements.
An Urban Planning Code will be developed and adopted to define regulatory priorities, sustainable development objectives for the industry, pricing mechanisms, address systemic industry problems, ensure compliance with international standards and reduce the number of subordinate regulatory legal acts.
To ensure systematic and coordinated work in construction, the establishment of a unified centre for urban planning, standardization and expertise will be provided for on the basis of RSE “State Urban Planning Cadastre”, RSE “State Expertise” and JSC “Kazakh Research and Design Institute of Construction and Architecture”.
To monitor housing affordability and assess the effectiveness of measures, JSC “Kazakhstan Housing Company” will conduct analytical studies with visualization of the results in an information system.
2. Provision of Housing to Categories of Citizens Defined by Housing Legislation
The measures being implemented to provide housing to citizens registered as persons in need of housing (hereinafter referred to as persons on the waiting list) in accordance with the requirements of the Law of the Republic of Kazakhstan “On Housing Relations” (hereinafter referred to as the Law) do not have a significant impact on reducing the waiting list due to the inconsistency of the statuses of registered citizens with the established criteria.
The priority task of local executive bodies will be to conduct an inventory of the number of persons on the waiting list in order to bring it into compliance with the current legislation of the Republic of Kazakhstan.
Overall, housing legislation will be reformed through the introduction of new approaches, including consideration of the transformation of JSC “Otbasy Bank” into a national development and support institution with the authority to register and maintain records of persons in need of housing.
State support measures will be provided taking into account total family income and the housing need criteria defined by housing legislation.
At the same time, important reference points in implementing state support measures will include data from the digital family profile and the anticipated tax reform concerning income declaration.
State support measures for resolving housing issues of persons on the waiting list will provide for:
1. Subsidization of rental payments in the private housing stock for persons on the waiting list whose total family income per family member is below 1 subsistence minimum.
Rental housing subsidies in the private housing stock will be provided through JSC “Otbasy Bank” within the limits of funds allocated under the Law on the Republican Budget and decisions of local representative bodies for the relevant financial year, in accordance with the procedure determined by the authorized body.
Housing may be rented from individuals or legal entities holding ownership rights to real estate.
A module containing a database of landlords will be created on the otbasybank.kz portal, allowing tenants to select the housing they need.
2. Provision of rental housing without the right to purchase to persons on the waiting list belonging to socially vulnerable categories, in the order of priority in accordance with the requirements of the Law.
Taking into account the requirements of the Law, at least 20% of the total volume of rental housing without the right to purchase will be provided to persons on the waiting list specified in subparagraphs 6) and 9) of Article 68 of the Law (for each category respectively).
To ensure that local executive bodies have the necessary volume of коммунal housing stock, funds will be provided from the republican budget for the construction, acquisition and/or reconstruction of social housing in accordance with the standard determined by the authorized body, with mandatory co-financing from the local budget.
At the same time, the construction of rental housing without the right to purchase will be prioritized in rural areas and border territories.
3. Provision through JSC “Otbasy Bank” of preferential loans at interest rates of 2%–5% to persons on the waiting list for the purchase of social housing constructed (acquired) using funds raised by local executive bodies through the issuance of government securities (hereinafter referred to as GSs).
At the same time, JSC “Kazakhstan Housing Company” will provide local executive bodies with bond loans, including through funds from the National Fund of the Republic of Kazakhstan and the National Bank of the Republic of Kazakhstan, with the right to combine them with funds attracted from market sources.
The procedure and conditions for financing the construction (acquisition) of social housing by local executive bodies through the issuance of GSs, monitoring and sale of housing to persons on the waiting list through JSC “Otbasy Bank” will be determined by rules approved by the authorized body.
Monitoring of housing projects implemented by local executive bodies will be ensured through the information system of JSC “Kazakhstan Housing Company”.
JSC “Otbasy Bank” will be provided with budget loans from republican and local budget funds to issue preferential loans to persons on the waiting list.
To accelerate the resolution of housing issues for persons on the waiting list, local executive bodies will be granted the legislative right to purchase completed primary housing, as well as housing in buildings under construction involving shared participation and secured by a guarantee of JSC “Kazakhstan Housing Company”, using funds received from GSs.
Social housing will correspond to comfort classes III–IV in accordance with the requirements of state regulations in the fields of architecture, urban planning and construction. The total area of one housing unit will be within 80 square metres, with an allowable deviation of up to 5%.
3. Development of Mortgage Housing Lending
To avoid significant fluctuations in the real estate market and maintain financial stability, a transition to market mechanisms of mortgage lending will be carried out, with the introduction of subsidies for interest rates on mortgage programmes of financial institutions using funds from the republican budget.
The conditions for providing subsidies to reimburse part of the interest rate on mortgage housing loans issued by second-tier banks to the population through quasi-public sector entities will be determined by rules approved by the authorized body.
Local executive bodies, together with JSC “Otbasy Bank”, will implement regional preferential lending programmes for young people and residents of single-industry towns with low development potential.
Within the framework of the instruments of JSC “Otbasy Bank”, a preferential mortgage will be provided with a 10% initial down payment and an interest rate of no more than 5% for residents of single-industry towns with low development potential, provided that they do not own housing anywhere in the territory of the Republic of Kazakhstan and have a social employment contract. Financing of the preferential mortgage will be provided through local budget funds, employers' funds and other sources.
JSC “Otbasy Bank” will implement the “Zhana Baspana” programme for lending to military personnel, employees of special state bodies and internal affairs officers receiving housing payments, using borrowed and own funds, including funds from net profit earned during the relevant financial year.
Alongside these mortgage lending development instruments, the following measures will be considered:
- increasing the investment attractiveness and liquidity of mortgage securities;
- standardization and digitalization of the mortgage market, including reducing the costs incurred by citizens and banks in arranging and servicing mortgage loans by transferring interactions between borrowers, banks and state bodies into electronic format;
- developing a mortgage lending mechanism for the construction of individual residential houses, including preferential mortgage programmes and the construction of individual residential houses by citizens independently;
- expanding opportunities for using digital assets in construction (digital money, digital mortgage certificates);
- applying a differentiated approach to the implementation of preferential mortgage mechanisms, taking into account the volume of intensive housing construction by private developers and territorial location (rural settlements and border territories).
4. Protection of Equity Contributions in Housing Construction
1. Mechanism for Completing Problematic Housing Construction Facilities Built in Circumvention of Legislation
Local executive bodies will continuously monitor the construction of residential facilities in order to identify problematic housing construction facilities in the region.
Issues related to identifying facilities as problematic and completing their construction by attracting investors, an authorized organization or through other methods will be considered by an interdepartmental commission on shared participation in housing construction to be established by local executive bodies.
The Law on Shared Participation in Housing Construction provides for the legal basis for establishing an authorized organization, the formation and increase of whose authorized capital will be carried out using local budget funds.
The Law on Shared Participation in Housing Construction provides for the legal basis for establishing an authorized organization, the formation and increase of whose authorized capital will be carried out using local and republican budget funds, in order to ensure the construction of MARBs with subsequent sale and reinvestment of the proceeds in construction, as well as to resolve issues involving individuals recognized by a court decision as having suffered losses as a result of “double sales” and the absence of existing floor areas.
As additional sources of financing, authorized organizations will attract budget loans in accordance with the procedure provided for by the current budget legislation of the Republic of Kazakhstan, including within the framework of the issuance of GSs by local executive bodies, subject to ensuring housing availability for persons on the waiting list defined by housing legislation in accordance with the rules approved by the authorized body.
Local executive bodies will ensure the maintenance in the “Kazregister” system of a nominal register of equity holders in problematic facilities, indicating the amount of funds invested and the cost of the apartment being acquired, the name and location of the facility, and the status of property claims.
In accordance with the procedure approved by local executive bodies, the authorized organization will use attracted funds to conduct financial, legal and technical audits of problematic housing construction facilities, demolish and/or dismantle facilities, including unfinished construction facilities, acquire land plots (land use rights), finance design and construction and installation works, construct new MARBs, and provide advance financing for construction subject to the repayment of funds.
To enable the authorized organization to finance construction, a financial and technical audit of problematic facilities must be available, as well as design and estimate documentation for the remaining types of work that has undergone comprehensive non-departmental expert review in accordance with the established procedure, determining the pricing and technical parameters of residential facilities. Based on these documents, as well as data on the availability of vacant floor areas, the authorized organization will determine the amount of financial resources required to complete construction, subject to repayment of funds within the established deadlines.
The repayment of invested funds will be ensured through the transfer to the authorized organization of vacant floor areas and/or proceeds from their sale in problematic facilities and/or new MARBs, as well as funds and/or property recovered in favour of equity holders.
Taking into account the repayment of funds and in agreement with local executive bodies, the authorized organization will repeatedly use funds from the sale of vacant floor areas in facilities and/or funds from the sale of property recovered in favour of equity holders, as well as funds provided under credit facilities, for the construction of new MARBs (with integrated premises and parking facilities).
Local executive bodies will finance the construction of engineering networks and landscaping required to complete problematic facilities using local budget funds.
2. Improvement of the Mechanism for Equity Contributions
Measures will be provided to improve legislation on shared participation in housing construction by creating more favourable conditions for all market participants, strengthening the liability of real estate agencies, sales departments, advertising companies, real estate agents and developers constructing in circumvention of legislation, increasing penalties, and expanding the functions of authorized organizations in attracting equity holders' funds when implementing housing stock renovation measures.
The “Kazregister” system will be modernized in order to identify the illegal attraction of equity holders' funds and prevent “double sales”.
Requirements for housing construction cooperatives will be strengthened in terms of mandatory availability of land plots for project implementation, at least 50% of participants based on the draft design at the time of establishment, and approved design and estimate documentation when attracting additional participants.
5. Renewal of the Housing Stock
1. Mechanisms for Housing Stock Renovation
Local executive bodies will approve housing stock renovation programmes for “old neighbourhoods” in agreement with the public and establish in these programmes the implementation mechanisms and criteria, including the procedure and conditions for compensating owners of housing in multi-apartment residential buildings, as well as financing mechanisms, including those involving an authorized organization.
At the same time, owners of residential premises will be provided with new apartments of equivalent floor area, but not smaller than a one-room apartment. Owners of non-residential premises will be compensated for their value.
If the owner of non-residential premises agrees, compensation for the property being transferred may be provided through the allocation of non-residential premises of equivalent floor area in buildings under construction.
The list of facilities subject to renovation will be determined by local executive bodies, taking into account the deterioration of structural elements of the housing stock, their compliance with operational requirements and the opinions of property owners.
The demolition of emergency (dilapidated) residential houses will be carried out using local budget funds.
Within the framework of housing stock renovation projects, local executive bodies will provide for the construction of small-sized housing and housing of comfort classes I–IV, with commercial premises and parking facilities, for sale on the market in order to reinvest in the project or renovate dilapidated housing.
The sale price of 1 square metre of total housing floor area will be determined by the comfort level of the housing being constructed and the prevailing market conditions at the time of sale, but shall not be lower than the construction cost.
Funds from local budgets, GSs, private investment, including through PPP mechanisms, loans from financial institutions and quasi-public sector entities, and income from the sale of residential and non-residential premises during project implementation will be allocated to finance housing stock renovation projects.
When funds attracted by local executive bodies through the issuance of GSs are used to finance the construction of the residential part of facilities, the sale of housing to persons on the waiting list will be provided for in proportion to the volume of financing, in accordance with the rules approved by the authorized bodies.
2. Modernization of the Housing Stock
Local executive bodies will conduct an inventory of the housing stock with an assessment of its technical condition (certification of the housing stock).
As a result of the inventory, objective data will be obtained on the number of buildings and their technical characteristics, energy efficiency class, availability of common-household meters and automated heat consumption regulation systems.
A register of data for each residential building that has undergone certification and is subject to demolition or major repairs will be created in the Centralized Collection Information System.
In the field of energy conservation and improving energy efficiency for the renovation of the housing sector, incentive mechanisms will be introduced, such as energy efficiency classes and post-project analysis of compliance with energy efficiency requirements for new buildings.
To ensure the rational use of energy resources and transparency of tariffs for consumed resources, the housing sector will be equipped with common-household heat energy and water meters with remote data transmission and automated (individual) heating units using local budget funds, own funds of condominium facilities and other sources.
Information and explanatory work will be carried out among the population on energy conservation and improving energy efficiency, which will enable apartment owners and owners of non-residential premises to develop an understanding of the need to take care of the common property of condominium facilities and save energy resources.
Local executive bodies will ensure, using local budget funds, the maintenance of an authorized organization specializing in the repair of residential buildings.
Budget loans will be used for major repairs of MARBs and condominium facilities, combining them with revolving funds received from previously allocated budget loans for the repair of other MARBs and condominium facilities.
For repairs in MARBs, budget loans from the republican budget will be allocated to regional budgets and the budgets of the cities of Astana, Almaty and Shymkent at an interest rate of 0.1% per annum for a period of 7 years.
Within the framework of local budget funds, local executive bodies will organize and finance major repairs of MARBs and the replacement (repair) of elevators in MARBs, subject to the repayment of funds by owners of premises (apartments).
The mechanism for assigning housing assistance to low-income citizens to pay for коммунal services will be automated, which will accelerate the receipt of public services.
As part of the implementation of the reform in the HCS sector, local executive bodies will ensure the state technical inspection of operating MARBs and the registration of condominium facilities using local budget funds. This will make it possible to ensure 100% registration of condominium facilities throughout the Republic and create the legal basis for apartment owners and owners of non-residential premises to use separate parts of the common property of condominium facilities.
To introduce effective mechanisms for housing stock management, measures will be taken to continuously improve housing legislation, including granting housing inspections the right to conduct inspection examinations of supervised facilities and strengthening the status of housing inspectors.
To implement a set of measures aimed at improving the competence and qualifications of human resources, training events will be held for chairpersons of property owners' associations and authorized representatives of simple partnerships.
6. Target Indicators and Expected Results
Target Indicator 1
Ensuring access of the population to water supply services in cities and villages – 100% by 2025–2029.
Target Indicator 2
Reducing the deterioration of heat, water supply and wastewater disposal networks from 51% to 40% by 2030.
Target Indicator 3
Ensuring the level of wastewater treatment in cities of national and regional significance increases from 77.7% to 98.1% by 2030.
Target Indicator 4
Housing affordability – 0.53 (the ratio of average per capita income of the population to the average cost of 1 sq. m of housing (sale of new housing (apartments in multi-apartment residential buildings)) by 2030.
Target Indicator 5
Reducing the share of condominium facilities requiring major repairs from 31.2% to 28.8% by 2030.
Main expected results by the end of 2029:
1. Increasing the share of the population satisfied with living conditions from 54.9% to 60%.
2. Increasing the population's access to water supply services by 2.1 million people.
3. Reducing heat energy losses in multi-storey residential buildings through the use of energy-efficient technologies from 57% to 30%.
4. Increasing investment in housing construction by 8%.
Appendix to the Concept for the Development of Housing and коммунal Infrastructure for 2023–2029
Action Plan for the Implementation of the Concept for the Development of Housing and коммунal Infrastructure for 2023–2029
Below is the English translation, preserving the original structure, numbering, tables, deadlines, responsible authorities, notes, abbreviations, and hyperlinks.
Approved by Resolution No. 736 of the Government of the Republic of Kazakhstan dated September 23, 2022
Action Plan for the Development of Housing and Utilities and Housing Construction
| No. | Name of reforms / key activities | Form of completion | Completion deadline | Responsible executors |
|---|---|---|---|---|
| Area 1. Improving the quality of housing and utility services through the development of the utilities sector | ||||
| Target indicator 1. Public access to water supply services: in cities (2023 – 99%, 2024 – 99.5%, 2025–2029 – 100%); in rural areas (2023 – 96.3%, 2024 – 98%, 2025–2029 – 100%). | MIID, MEEPR, MF, MNE, akimats of the regions and the cities of Astana, Almaty and Shymkent, entities of natural monopolies, JSC "KazCentre for Housing and Utilities" (by agreement), RSE "State Urban Planning Cadastre" (by agreement). | |||
| Target indicator 2. Reducing the deterioration of heat supply, water supply and wastewater disposal networks (2023 – 50%, 2024 – 49%, 2025 – 48%, 2026 – 46%, 2027 – 44%, 2028 – 42%, 2029 – 40%). | MIID, MF, MEEPR, Ministry of Energy, MNE, akimats of the regions and the cities of Astana, Almaty and Shymkent, entities of natural monopolies, JSC "KazCentre for Housing and Utilities" (by agreement). | |||
| Target indicator 3. Level of wastewater treatment in cities of republican and regional significance (2023 – 77.7%, 2024 – 79%, 2025 – 84%, 2026 – 85%, 2027 – 92%, 2028 – 97%, 2029 – 98.1%). | MIID, MF, MEEPR, Ministry of Energy, MNE, akimats of the regions and the cities of Astana, Almaty and Shymkent, entities of natural monopolies, JSC "KazCentre for Housing and Utilities" (by agreement). | |||
| Reform 1. Institutional measures | ||||
| 1. | Working out the issue of improving legislation on the development of water supply and wastewater disposal systems | Proposal to the Government | 3rd quarter of 2023 | MIID, akimats of the regions and the cities of Astana, Almaty and Shymkent, JSC "KazCentre for Housing and Utilities" (by agreement). |
| 2. | Conducting technical inspections of heat supply, water supply and wastewater disposal networks to determine their actual level of deterioration | Technical inspection reports | 4th quarter of 2023 | MIID, akimats of the regions and the cities of Astana, Almaty and Shymkent, JSC "KazCentre for Housing and Utilities" (by agreement). |
| 3. | Updating regional plans for the construction, reconstruction and modernization of water supply and wastewater disposal systems, taking into account needs | Regional plans | Annually, during 2023–2029 | MIID, akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 4. | Adoption of regional plans for the construction, reconstruction and modernization of heat supply systems, taking into account needs | Akim's order, information submitted to MIID | Annually, during 2023–2029 | Akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 5. | Working out the issue of establishing the National Housing and Utilities Infrastructure Centre on the basis of JSC "KazCentre for Housing and Utilities" | Proposal to the Government | 4th quarter of 2023 | MIID, MNE, MF, Ministry of Energy, MEEPR, akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 6. | Providing rural settlements with operating enterprises for water supply and wastewater disposal | Decision of local executive bodies | 2023–2029 | Akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 7. | Development and adjustment of the General Scheme for the Territorial Organization of the Republic of Kazakhstan for the purpose of populating the automated information system of the State Urban Planning Cadastre | Resolution of the Government of the Republic of Kazakhstan | 2024–2029 | MIID, MF, MNE, akimats of the regions and the cities of Astana, Almaty and Shymkent, RSE "State Urban Planning Cadastre" (by agreement). |
| 8. | Development and adjustment of interregional territorial development schemes for regions and agglomerations for the purpose of populating the automated information system of the State Urban Planning Cadastre | Order of MIID | 2024–2029 | MIID, akimats of the regions and the cities of Astana, Almaty and Shymkent, RSE "State Urban Planning Cadastre" (by agreement). |
| Reform 2. Implementation of infrastructure projects within the framework of budget financing | ||||
| 9. | Construction of 9,000 km of water supply networks in urban and rural areas | Commissioning certificates | Annually, in the 1st quarter of the year following the reporting year | MIID, MEEPR, akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 10. | Installation of integrated water treatment block modules in 963 rural settlements | Commissioning certificates | Annually, in the 1st quarter of the following year | MIID, akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 11. | Implementation of 43 projects for the construction and reconstruction of group water pipelines | Commissioning certificates | Annually, in the 1st quarter of the following year | MEEPR, akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 12. | Conducting prospecting and exploration works to determine underground water reserves, taking into account the needs of water supply systems | Report to MIID | Annually, in January 2023–2025 | Akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 13. | Reconstruction of 14,000 km of heat supply, water supply and wastewater disposal networks | Commissioning certificates | Annually, in the 1st quarter of the following year | MIID, akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 14. | Construction and reconstruction of 1,225 km of stormwater drainage and irrigation ditch systems | Commissioning certificates | Annually, in the 1st quarter of the following year | MIID, MF, akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| Reform 3. Creating conditions for increasing investment attractiveness through financial instruments, tariff policy and tax preferences | ||||
| 15. | Implementation of 68 infrastructure projects for the construction and reconstruction of wastewater treatment facilities through various financing mechanisms | Commissioning certificates | Annually, during 2023–2029 | MIID, MF, MNE, akimats of the regions and the cities of Astana, Almaty and Shymkent, entities of natural monopolies, JSC "KazCentre for Housing and Utilities" (by agreement). |
| 16. | Attracting loans from international financial organizations and bond loans from national institutions under a state guarantee for the implementation of projects involving the construction and reconstruction of wastewater treatment facilities | Agreements | Annually, 2023–2029 | Akimats of the regions and the cities of Astana, Almaty and Shymkent, MNE, MF, JSC "KazCentre for Housing and Utilities" (by agreement), entities of natural monopolies. |
| 17. | Development of a new mechanism for subsidizing the costs of servicing and repaying loans from other sources | Proposal to the Government | 2nd quarter of 2024 | MIID, MF, MNE, akimats of the regions and the cities of Astana, Almaty and Shymkent, entities of natural monopolies, JSC "KazCentre for Housing and Utilities" (by agreement). |
| Reform 4. Introduction of new technologies and digitalization of the sector | ||||
| 18. | Conducting research and development work in the field of earthquake-resistant construction, with improvements to scientific and technical documentation | Minutes of the Scientific and Technical Council | Annually, 2023–2029 | MIID, JSC "KazCentre for Housing and Utilities" (by agreement). |
| 19. | Automation of production processes in heat supply, water supply, wastewater disposal and treatment facilities, and electricity networks, with integration into the information system for centralized collection and storage of electronic information resources in the field of housing relations and housing and utilities | Commissioning certificates | Annually, during 2024–2029 | MIID, MEEPR, Ministry of Energy, akimats of the regions and the cities of Astana, Almaty and Shymkent, entities of natural monopolies, JSC "KazCentre for Housing and Utilities" (by agreement). |
| 20. | Installation of 18,706 common building heat and water meters | Report to MIID | Annually, during 2023–2029 | Akimats of the regions and the cities of Astana, Almaty and Shymkent, JSC "KazCentre for Housing and Utilities" (by agreement). |
| 21. | Updating professional standards for the housing and utilities sector | Joint orders of MIID, MEEPR and the Ministry of Energy | 2023–2024 | MIID, Ministry of Energy, MEEPR, MNE, JSC "KazCentre for Housing and Utilities" (by agreement). |
| 22. | Inventory of underground and above-ground utilities across 227,000 hectares of built-up areas of settlements for the purpose of populating the State Urban Planning Cadastre (2023 – 83.1 ha, 2024 – 60.2 ha, 2025 – 17.4 ha, 2026 – 17.4 ha, 2027 – 15.9 ha, 2028 – 17.2 ha, 2029 – 15.8 ha) | Electronic database | Annually, 2023–2029 | MIID, akimats of the regions and the cities of Astana, Almaty and Shymkent, RSE "State Urban Planning Cadastre" (by agreement). |
| 23. | Modernization and maintenance of the automated information system of the State Urban Planning Cadastre (introduction of new modules and implementation of the system's analytical capabilities) | Testing report | Annually, 2024–2029 | MIID, RSE "State Urban Planning Cadastre" (by agreement). |
| Area 2. Increasing housing affordability for broad segments of the population through the development of housing infrastructure | ||||
| Target indicator 4. Housing affordability across the Republic (2023 – 0.39, 2024 – 0.41, 2025 – 0.44, 2026 – 0.47, 2027 – 0.49, 2028 – 0.51, 2029 – 0.53). | MIID, MNE, MF, MLSPP, Ministry of Energy, Ministry of Agriculture, Ministry of Information and Social Development, akimats of the regions and the cities of Astana, Almaty and Shymkent, JSC "National Managing Holding 'Baiterek'" (by agreement), JSC "Otbasy Bank" (by agreement), JSC "Kazakhstan Housing Company" (by agreement), RSE "State Urban Planning Cadastre" (by agreement), JSC "Kazakh Research and Design Institute of Construction and Architecture" (by agreement), RSE "State Expertise" (by agreement). | |||
| Target indicator 5. Share of condominium facilities requiring major repairs (2023 – 31.2%, 2024 – 30.8%, 2025 – 30.3%, 2026 – 30%, 2027 – 29.6%, 2028 – 29.2%, 2029 – 28.8%). | MIID, akimats of the regions and the cities of Astana, Almaty and Shymkent, JSC "KazCentre for Housing and Utilities" (by agreement), JSC "Kazakh Research and Design Institute of Construction and Architecture" (by agreement). | |||
| Reform 5. Attracting private investment in housing construction | ||||
| 24. | Construction of 111 million square metres of housing from all sources of financing (2023 – 15.3, 2024 – 15.5, 2025 – 15.7, 2026 – 15.9, 2027 – 16.1, 2028 – 16.3, 2029 – 16.5) | Commissioning certificates | Annually, in the 1st quarter of the year following the reporting year | MIID, akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 25. | Development of master plans and detailed planning projects for settlements, taking into account the development of housing, social and transport infrastructure | Decisions of maslikhats | Annually, 2023–2029 | Akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 26. | Adoption of regional housing construction plans based on urban planning documents, taking into account the economic potential of settlements, the population size and the requirements established by housing and land legislation | Decision of local executive bodies | 4th quarter of 2023 | Akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 27. | Provision of engineering and utility infrastructure to residential facilities being built by private developers in new residential development areas, with monitoring of the fulfilment of reciprocal obligations | Commissioning certificates | Annually, in the 1st quarter of the year following the reporting year | MIID, MF, Ministry of Agriculture, akimats of the regions and the cities of Astana, Almaty and Shymkent, JSC "Kazakhstan Housing Company" (by agreement). |
| 28. | Development of a module for the "Nurly Zher" Situation Centre to monitor local executive body projects for the provision of engineering infrastructure to residential facilities of private developers | Commissioning certificate for industrial operation | 2nd quarter of 2024 | MIID, akimats of the regions and the cities of Astana, Almaty and Shymkent, JSC "Kazakhstan Housing Company" (by agreement). |
| 29. | Provision of engineering and utility infrastructure to land plots allocated to citizens for the construction of individual residential houses (40,000 land plots annually) | Commissioning certificates | Annually, in the 1st quarter of the year following the reporting year | MIID, MF, Ministry of Agriculture, akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 30. | Implementation of individual housing construction projects for citizens on the waiting lists for land plots and housing, in accordance with the requirements of housing legislation | Commissioning certificates | Annually, in the 1st quarter of the year following the reporting year | Akimats of the regions and the cities of Astana, Almaty and Shymkent, JSC "Kazakhstan Housing Company" (by agreement), JSC "Otbasy Bank" (by agreement). |
| 31. | Approval of rules for subsidizing the costs of employers who have built housing for their employees in rural settlements | Order of MIID | 2nd quarter of 2023 | MIID, akimats of the regions and the cities of Astana, Almaty and Shymkent, MNE, Ministry of Agriculture, National Chamber of Entrepreneurs (by agreement). |
| 32. | Approval of the list of rural settlements in which employers plan to construct housing | Decisions of maslikhats | 2nd quarter of 2023 | Akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 33. | Subsidizing the costs of employers who have built rental housing in a village, settlement or rural district | Agreements | Annually, 2023–2029 | MIID, akimats of the regions, MNE, Ministry of Agriculture, National Chamber of Entrepreneurs (by agreement). |
| 34. | Subsidizing interest rates on loans provided to private developers | Agreements | Annually, 2023–2029 | MIID, JSC "Kazakhstan Housing Company" (by agreement), National Chamber of Entrepreneurs (by agreement), akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 35. | Amendments to the Rules for Subsidizing Interest Rates on Loans Issued by Second-Tier Banks to Private Entrepreneurship Entities for Housing Construction Purposes | Order of MIID | 3rd quarter of 2023 | MIID, akimats of the regions, MNE, Ministry of Agriculture, National Chamber of Entrepreneurs (by agreement). |
| 36. | Consideration of the terms of project financing for investment projects of private developers | Agreements | Annually, 2023–2029 | MIID, JSC "Kazakhstan Housing Company" (by agreement), akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 37. | Working out the implementation of rental housing projects under the public-private partnership principle using properties held on the balance sheets of local executive bodies and leased without a purchase option to citizens on the waiting lists for housing, in accordance with housing legislation | Proposal to the Government | 1st quarter of 2024 | MIID, MF, MNE, JSC "Kazakhstan Housing Company" (by agreement), akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 38. | Implementation of projects for the development of the construction industry | Commissioning certificates | Annually, 2023–2029 | Akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 39. | Ensuring that house-building plants are supplied with orders for the implementation of housing projects | Report to MIID | Annually, 2023–2029 | Akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 40. | Promotion of the online construction materials platform | Report to MIID | Annually, 2023–2029 | JSC "Kazakhstan Housing Company" (by agreement), National Chamber of Entrepreneurs (by agreement). |
| 41. | Development of criteria for the introduction of building information modelling technology (BIM) in the design of construction facilities | Draft Law | 4th quarter of 2023 | MIID, MF, MNE, MLSPP, National Chamber of Entrepreneurs (by agreement). |
| 42. | Development and revision of cost-estimate and regulatory documents in the construction sector | Order of the Committee for Construction and Housing and Utilities of MIID | Annually, 2023–2029 | MIID, JSC "Kazakh Research and Design Institute of Construction and Architecture" (by agreement), National Chamber of Entrepreneurs (by agreement). |
| 43. | Integration of "E-QURYLYS" with the necessary information systems related to the construction industry and housing and utilities | Testing report | 4th quarter of 2023 | MIID. |
| 44. | Monitoring the use of data from the Unified State Project Bank | Report to MIID | Annually, 2023–2029 | RSE "State Expertise" (by agreement). |
| 45. | Working out proposals for establishing a single centre for urban planning, standardization and expert assessment to ensure systematic and coordinated work in construction | Proposal to the Government | 4th quarter of 2023 | MIID, MNE, MF, RSE "State Urban Planning Cadastre" (by agreement), JSC "Kazakh Research and Design Institute of Construction and Architecture" (by agreement), RSE "State Expertise" (by agreement). |
| 46. | Assessment of the effectiveness of measures, with visualization of the results in the information system of the "Nurly Zher" Situation Centre | Report to MIID | Annually, 2023–2029 | JSC "Kazakhstan Housing Company" (by agreement), akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| Reform 6. Providing housing to categories of citizens defined by housing legislation | ||||
| 47. | Conducting an inventory of the registered number of citizens defined by housing legislation who have been placed on the waiting list, in order to bring the records into compliance with current legislation | Report to MIID | 3rd quarter of 2023 | Akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 48. | Reforming housing policy | Draft Law | 1st quarter of 2024 | MIID, MF, MNE, akimats of the regions and the cities of Astana, Almaty and Shymkent, JSC "Otbasy Bank" (by agreement), JSC "National Managing Holding 'Baiterek'" (by agreement). |
| 49. | Provision of housing payments to certain categories of socially vulnerable citizens, as defined by housing legislation, for renting housing in the private housing stock | Lease agreements | Annually, 2023–2029 | MIID, akimats of the regions and the cities of Astana, Almaty and Shymkent, JSC "Otbasy Bank" (by agreement). |
| 50. | Development of a module containing a database of landlords on the otbasybank.kz portal | Testing report | 3rd quarter of 2023 | MIID, JSC "Otbasy Bank" (by agreement). |
| 51. | Approval of plans for the construction (acquisition) of social-purpose housing for rent without the right to purchase, taking into account territorial data on the number of citizens defined by housing legislation | Roadmaps | Annually, in the 1st quarter of 2023–2029 | Akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 52. | Construction (acquisition) of social-purpose housing for rent without the right to purchase by citizens belonging to socially vulnerable categories defined by housing legislation (70,703 rental apartments) | Commissioning certificates, agreements | Annually, 2023–2029 | MIID, MF, akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 53. | Approval of plans for the construction (acquisition) of social-purpose housing using government securities and transfer of unit-specific information on housing being implemented to JSC "Otbasy Bank", taking into account territorial data on the number of citizens on the waiting lists as defined by housing legislation | Roadmaps | Annually, in the 1st quarter of 2023–2029 | Akimats of the regions and the cities of Astana, Almaty and Shymkent, JSC "Kazakhstan Housing Company" (by agreement), JSC "Otbasy Bank" (by agreement). |
| 54. | Provision by JSC "Otbasy Bank" of preliminary and interim housing loans at interest rates of 2%–5% for the purchase of social-purpose housing from local executive bodies (42,548 loans) | Loan agreements | Annually, 2023–2029 | MIID, MF, MNE, akimats of the regions and the cities of Astana, Almaty and Shymkent, JSC "Otbasy Bank" (by agreement), JSC "National Managing Holding 'Baiterek'" (by agreement). |
| 55. | Working out the issue of granting local executive bodies the right to purchase, using government securities, completed primary housing and housing in buildings under construction with shared-equity construction projects secured by a guarantee of JSC "Kazakhstan Housing Company" | Proposal to the Government | 2023 | MIID, MF, MNE, akimats of the regions and the cities of Astana, Almaty and Shymkent, JSC "Otbasy Bank" (by agreement), JSC "National Managing Holding 'Baiterek'" (by agreement). |
| Reform 7. Development of mortgage housing lending | ||||
| 56. | Subsidizing interest rates on mortgage housing loans | Agreements | Annually, 2023–2029 | MIID, MNE, MF, JSC "Kazakhstan Housing Company" (by agreement), National Chamber of Entrepreneurs (by agreement). |
| 57. | Amendments to the Rules for Granting Subsidies to Reimburse Part of the Interest Rate on Mortgage Housing Loans Issued by Second-Tier Banks to the Population through Quasi-Public Sector Entities | Order of MIID | 4th quarter of 2023 | MIID, MF, MNE, National Chamber of Entrepreneurs (by agreement), JSC "National Managing Holding 'Baiterek'" (by agreement), JSC "Kazakhstan Housing Company" (by agreement). |
| 58. | Ensuring the necessary amount of financing for the implementation of mortgage programmes for young citizens at an interest rate not exceeding 5% | Decisions of maslikhats | Annually, 2023–2029 | Akimats of the regions and the cities of Astana, Almaty and Shymkent, JSC "Otbasy Bank" (by agreement). |
| 59. | Ensuring the necessary amount of financing for the implementation of mortgage programmes for young residents of single-industry towns at an interest rate not exceeding 5% | Decisions of maslikhats | Annually, 2023–2029 | Akimats of the regions and the cities of Astana, Almaty and Shymkent, JSC "Otbasy Bank" (by agreement). |
| 60. | Ensuring the necessary amount of financing for the provision of housing certificates to cover part of the down payment on mortgage housing loans | Decisions of maslikhats | Annually, 2023–2029 | Akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 61. | Consideration of the issue of increasing the number of citizens entitled to housing certificates | Decisions of maslikhats | Annually, 2023–2029 | Akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 62. | Ensuring the provision of housing certificates | Report to MIID | Annually, 2023–2029 | Akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| Reform 8. Ensuring the protection of equity contributions in housing construction | ||||
| 63. | Monitoring residential facilities under construction | Report to MIID | Annually, 2023–2029 | Akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 64. | Completion of construction of 44 problematic facilities involving shared-equity participation | Report to MIID | Annually, 2023–2026 | Akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 65. | Improvement of the unified information system for shared-equity participation in housing construction, "Kazreestr" | Testing report | Annually, 2023–2029 | MIID, JSC "Kazakhstan Housing Company" (by agreement), akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 66. | Improvement of legislation on shared-equity participation in housing construction | Draft Law | 4th quarter of 2023 | MIID, JSC "Kazakhstan Housing Company" (by agreement), akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| Reform 9. Renewal of the housing stock | ||||
| 67. | Updating and adopting renovation programmes | Roadmaps | 4th quarter of 2023 | Akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 68. | Demolition of 1,500 unsafe and dilapidated buildings | Report to MIID | Annually, 2023–2029 | Akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 69. | Consideration of the issue of joint implementation of projects under housing stock renovation programmes | Report to MIID | Annually, 2023–2029 | JSC "Kazakhstan Housing Company" (by agreement), akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 70. | Major repairs with thermal modernization elements of 1,273 multi-apartment residential buildings | Certificate of completed works | Annually, in the 1st quarter of the year following the reporting year | MIID, akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 71. | Inventory of the housing stock for the purpose of populating the system for centralized collection and storage of electronic information resources in the field of housing relations and housing and utilities | Register of passportized multi-apartment residential buildings | 4th quarter of 2024 | Akimats of the regions and the cities of Astana, Almaty and Shymkent. |
| 72. | Conducting training courses for chairpersons of associations of property owners and authorized representatives of simple partnerships | Report to MIID | Annually, during 2023–2029 | Akimats of the regions and the cities of Astana, Almaty and Shymkent, JSC "KazCentre for Housing and Utilities" (by agreement). |
| 73. | Conducting information and awareness-raising activities on energy saving and improving energy efficiency | Report to MIID | Annually, during 2023–2029 | Akimats of the regions and the cities of Astana, Almaty and Shymkent, JSC "KazCentre for Housing and Utilities" (by agreement). |
| 74. | Conducting research and development work aimed at developing energy-efficient materials and technologies, as well as software and hardware systems for data transmission in order to reduce the cost of utility services | Minutes of the Scientific and Technical Council | Annually, during 2023–2029 | MIID, JSC "KazCentre for Housing and Utilities" (by agreement). |
| 75. | Automation of the mechanism for assigning housing assistance to low-income citizens to pay for utility services | Testing report | 4th quarter of 2024 | MIID, JSC "KazCentre for Housing and Utilities" (by agreement). |
| 76. | Strengthening the functions of housing inspections | Draft Law | 2023–2024 | MIID, MNE, akimats of the regions and the cities of Astana, Almaty and Shymkent, JSC "KazCentre for Housing and Utilities" (by agreement). |
Note: Explanation of abbreviations
| Abbreviation | Full name |
|---|---|
| Ministry of Agriculture | Ministry of Agriculture of the Republic of Kazakhstan |
| MIISD | Ministry of Information and Social Development of the Republic of Kazakhstan |
| JSC "NMH 'Baiterek'" | Joint-stock company "National Managing Holding 'Baiterek'" |
| Ministry of Science and Higher Education | Ministry of Science and Higher Education of the Republic of Kazakhstan |
| Local executive bodies | Local executive bodies |
| MLSPP | Ministry of Labour and Social Protection of the Population of the Republic of Kazakhstan |
| MIID | Ministry of Industry and Infrastructure Development of the Republic of Kazakhstan |
| WWT facilities | Wastewater treatment facilities |
| JSC "KazNIISA" | Joint-stock company "Kazakh Research and Design Institute of Construction and Architecture" |
| MF | Ministry of Finance of the Republic of Kazakhstan |
| JSC "KHC" | Joint-stock company "Kazakhstan Housing Company" |
| Committee for Construction and Housing and Utilities | Committee for Construction and Housing and Utilities |
| PPP | Public-private partnership |
| RSE "State Urban Planning Cadastre" | Republican State Enterprise "Republican Centre for State Urban Planning and Cadastre" |
| RSE "State Expertise" | Republican State Enterprise "State Non-Departmental Expertise" |
| JSC "Otbasy Bank" | Joint-stock company "Housing Construction Savings Bank 'Otbasy Bank'" |
| JSC "KazCentre for Housing and Utilities" | Joint-stock company "Kazakhstan Centre for Housing and Utilities" |
| ENM entities | Entities of natural monopolies |
| National Chamber of Entrepreneurs | National Chamber of Entrepreneurs of the Republic of Kazakhstan "Atameken" |
| MNE | Ministry of National Economy of the Republic of Kazakhstan |
| MEEPR | Ministry of Ecology and Natural Resources of the Republic of Kazakhstan |
| Ministry of Energy | Ministry of Energy of the Republic of Kazakhstan |
Appendix to Resolution No. 736 of the Government of the Republic of Kazakhstan dated September 23, 2022
List of Certain Decisions of the Government of the Republic of Kazakhstan That Have Become Invalid
- Resolution of the Government of the Republic of Kazakhstan dated December 31, 2019 No. 1054 "On Approval of the State Programme for Housing and Utilities Development 'Nurly Zher' for 2020–2025".
- Resolution of the Government of the Republic of Kazakhstan dated June 8, 2020 No. 357 "On Amendments and Additions to Resolution No. 1054 of the Government of the Republic of Kazakhstan dated December 31, 2019 'On Approval of the State Programme for Housing and Utilities Development "Nurly Zher" for 2020–2025'".
- Resolution of the Government of the Republic of Kazakhstan dated August 18, 2020 No. 520 "On Amendments and Additions to Resolution No. 1054 of the Government of the Republic of Kazakhstan dated December 31, 2019 'On Approval of the State Programme for Housing and Utilities Development "Nurly Zher" for 2020–2025'".
- Resolution of the Government of the Republic of Kazakhstan dated December 15, 2020 No. 849 "On Amendments and Additions to Resolution No. 1054 of the Government of the Republic of Kazakhstan dated December 31, 2019 'On Approval of the State Programme for Housing and Utilities Development "Nurly Zher" for 2020–2025'".
Constitution Law Code Standard Decree Order Decision Resolution Lawyer Almaty Lawyer Legal service Legal advice Civil Criminal Administrative cases Disputes Defense Arbitration Law Company Kazakhstan Law Firm Court Cases Declaration Decree Order Resolution Decision Report Conclusion Statement Conclusion Convention Contract Memorandum Methodology Norms Note Rules Program Charter Charter Article Commentary Resolution Regulations Protocol Draft Program Rules Messages